MV Projects

  • Project name: QDB New Service Compound
  • Location: Industrial Area
  • Client: M/s QDB
  • Project name: Energy city
  • Location:
  • Client:
  • Project name: New port project
  • Location:
  • Client:
  • Project name: Abraj quartier tower
  • Location:
  • Client:
  • Project name: marina 5 residence
  • Location: Lusail
  • Client: M/s PAT Engineering Enterprises
  • Project name: Vendome Mall Project
  • Location: Lusail
  • Client: M/s Voltas Qatar & Hamad and Mohammed Al Futtaim Joint Venture
  • Project name: Burj Damac Marina Mix36
  • Location: Lusail
  • Client: M/s Damac Properties Qatar
  • Project name: Al Merqab Tower / Shaza Tower
  • Location: Lusail
  • Client: M/s Domopan Qatarr
  • Project name: north residential villas
  • Location:
  • Client:
  • Project name: Al fardan villa
  • Location: Al Fardan
  • Client: M/s Qatari German Switchgear (QGC)
  • Project name: Qatar National Museum
  • Location: Corniche
  • Client: M/s BK Gulf
  • Project name: Al Bayt Stadium
  • Location: Al Khor
  • Client: M/s Leonardo Doha
  • Project name: Zulal Destination Spa & Family Resort
  • Location:
  • Client:
  • Project name: Al Ruwais Port
  • Location:
  • Client:
  • Project name: Dusit Hotel
  • Location: Westbay
  • Client: M/s Arabian MEP Contracting
  • Project name: AMI C
  • Location: Westbay
  • Client: M/s Arabian MEP Contracting

Place Vendome Project

  • location :Lusail
  • Client/Owner:Shk. Khaled Nasser Al Hama Thani
  • Contractor:Voltas Qatar Engineering, VAFE-JAV
  • Consultant :Hamad and / Mohamad Al Futtaim
  • Start Date :anuary 2017
  • Completion date :August 2019

Scope of Work

Supply, Installation, Testing & Commissioning of the following works:

  • HV works including HV cubicle panel & 11kV cable up to tie-in connection point within boundary limit.
  • Power transformer including bus bar connections.
  • Generator including ATS
  • Electrical LV distribution including LV-panel, sub main boards & motor control panel.
  • Main & sub main cables & cable containment.
  • Lighting installation including lighting points & light switches.
  • Installation only of lights fixtures.
  • Small power installation including wiring accessories & power isolator.
  • Earthing & lightning protection system
  • Lighting control system
  • Central battery system
  • Passive components for Telephone/Data system
  • CCTV system
  • Access control system
  • BGM System
  • Cable containment for building management system


LUSAIL INFRASTRUCTURE PROJECT FOR NORTH RESIDENTIAL & WEST WATER FRONT AREAS

  • location :Lusail City Qatar
  • Client/Owner:Alijarah Property
  • Contractor:Combined Group
  • Consultant :Halcrow Consulting Engineers
  • Start Date :August 2017
  • Completion date :October 2019

Scope of Work

  • Supply, Installation, Testing & Commissioning of 11kV Switchgear Panels, Transformer ,LV Panel and Accessories required for Substations as per Kahramaa standards.
  • Installation of Battery Charger
  • Installation of Substation Earthing System (Cable earth between earthing bar located in HV room to the HV Switchgear, Transformer, MV Panels.
  • Supply & Installation Cable Termination & Cable Joints for 11KV /3cx300 mm2 cable
  • Supply & Installation Cable Termination & Cable Joints for 11KV /3cx300 mm2 cable
  • Supply & installation of Control Cables from 11KV switchgear to the transformer & MV Panels
  • Survey Kahramaa GIS updates, Coordinates with Kahramaa for selfwork Approval


MV & LV SUBSTATION WORKS

  • location :Dukhan
  • Client/Owner:Ashgal
  • Contractor:Saudi Binladin Group
  • Consultant :Parsons
  • Start Date :March 2018
  • Completion date :March 2020

Scope of Work

  • Installation of transformer, free standing feeder pillar, LV switchgears, distribution panels, emergency distribution panels & lighting panels.
  • Installation, testing & commissioning of light fixtures including cabling works, light switches & final termination to distribution boards.
  • Small power works including wiring accessories
  • Earth rods – copper bonded for earthing & lightning
  • Installation of UPS panels
  • LV cable works including cable ladders & termination to substation panel
  • Small power works including wiring accessories
  • Installation & testing of 11KV switchgear
  • Testing & Commissioning
  • Installation of battery charger
  • Supply & installation of marshalling box
  • Supply & installation of substation earthing – solid copper
  • Supply & installation of 3Cx70mm2 from SS to TX room
  • Supply & installation of cable termination for 11KV switchgear to the transformer
  • Supply & installation of LV 1Cx630mm2 LSF cables
  • Co-ordinate with Kahramaa for getting self-work approval, approval of materials, arrange fitting inspection, test report submission to KM and energizing