MEP PROJECTS

Al Shoura Council Building

  • LOCATION :Doha
  • CLIENT/OWNER:Private Engineering
  • CONTRACTOR:QEMG Al Mana
  • CONSULTANT :UNII Engineering Consultancy
  • START DATE :November 2021
  • COMPLETION DATE :On going

Scope of Work

Supply, install, test and commissioned the following MEP works as specified in the following system:

  • Air Conditioning & Ventilation Works
    ➢ Package Type AC Units
    ➢ DX Type AHUs & FAHU
    ➢ VRF AC units
    ➢ DX Type precision AC units at Data Center Rooms
    ➢ Ventilation Fans including exhaust fans & fresh air fans
    ➢ Supply, return & ventilation air ducts including support fittings and air terminals
  • Plumbing & Drainage Works:
    ➢ Rain water works including pipe, fittings & rain water outlet
    ➢ Drainage piping network including valves, fittings, supports & accessories
    ➢ Pressure UPVC pipes for condensate drain piping works
    ➢ Drainage accessories including floor drain, roof drain, floor cleanout & roof vent cap
    ➢ Hot & cold-water supply piping works including valves, fitting, supports & piping accessories
    ➢ Plumbing equipment including water heater,
  • Fire Fighting System Works
    ➢ Wet sprinkler system including fire hose reels
    ➢ Portable fire extinguishers & fire blanket
    ➢ Automatic gas suppression system
    ➢ Fire pump set including control panel, interface with FACP, supports & accessories
    ➢ Connection to concrete tank including vortex plate, float switch & connection to fire pump
  • Electrical Work including:
    ➢ 11kV works including MV switchgears &11 kV cables up to plot limit only
    ➢ Standby diesel generator including day fuel tank, bulk fuel tank for 1 day and leak detection system
    ➢ UPS
    ➢ Power Transformer
    ➢ Electrical distribution including SMDBs, MCCs & DB including internal submain cables and containment
    ➢ Lighting installation including light points, switches, light fixtures
    ➢ Small power installation including wiring accessories and power isolators
    ➢ Earthing and lighting protection system
  • Extra Low Voltage Works
  • Cable Containment for ELV Systems


WATERFRONT RESIDENTIAL BUILDING

  • LOCATION :Lusail
  • CLIENT/OWNER:Damac Properties
  • CONTRACTOR:Draya Contracting LLC
  • CONSULTANT :Lacasa Qatar
  • START DATE :January 2020
  • COMPLETION DATE :On going

Scope of Work

Supply, Installation, Testing & Commissioning of the following
Electrical works:Supply, Installation, Testing & Commissioning of the following Electrical works:

  • HV works including HV cubicle panel & 11kV cable up to tie-in connection point within boundary limit.
  • Power transformer including bus bar connections.
  • Generator including ATS
  • Electrical LV distribution including LV-panel, sub main boards & motor control panel.
  • Main & sub main cables & cable containment.
  • Lighting control system.
  • CCTV system.
  • Cable containment for building management system.
  • Lighting installation including lighting points & light switches.
  • Installation of FHC’s
  • Installation only of lights fixtures.
  • Small power installation including wiring accessories & power isolator.
  • Earthing & lightning protection system.
  • Central battery system.
  • Passive components for Telephone/ Data system.
  • Access control system
  • BGM System.


MIXED USE BLDG. (1B+G+2P+5)

  • Location :Old Ghanim
  • Client/Owner:Mrs. Fatima A. Al Qayed
  • Contractor:Jefferson International Co.
  • Consultant :EHAF Consulting Engineers
  • Start Date :January 2020
  • Completion date :On going

Scope of Work

Supply, Installation, Testing & Commissioning of the following MEP works:

Electrical Works including:

  • Generator including ATS.
  • Electrical LV distribution including LV-panel, sub main boards & motor control panel.
  • Lighting installation including lighting points & light switches.
  • Small power installation including wiring accessories & power isolator.
  • Installation of kWh meter.
Plumbing & Drainage Works including:

  • Water Supply and Drainage works.
  • Plumbing equipment including standalone water heaters, water pumps & water tank.
  • Installation of sanitary wares.
  • Installation of water meter.
Extra Low Voltage Works including:

  • Passive components for Telephone/Data system.
  • Fire Alarm System.
Air Conditioning & Ventilation Works including :

  • Provision of AC drain, pipe sleeves & copper pipe for DX split AC units.
  • Ventilation fans.
  • Air ducts including supports, insulation, fittings, accessories & air outlets.


G+1 Residential Palace

  • location :Muaither
  • Client/Owner:Al Jassim Group
  • Contractor:Jefferson International Co.
  • Consultant :Arab Consulting Engineers
  • Start Date :January 2019
  • Completion date :On going

Scope of Work

Supply, Installation, Testing & Commissioning of the following MEP works:

Mechanical Works including:

  • Water supply & drainage piping works.
  • Plumbing equipment including water pumps, submersible pump, domestic water filter & central water heater.
  • Conducting visual and preliminary inspection for all field initiating devices (smoke / heat detectors / manual call points/Interface units) and auxiliary field devices (alarm bell / horn strobes) including fire alarm control panel.
  • Portable fire extinguishers & fire blanket.
  • VRF air conditioning system with concealed type indoor units.
  • DX type fresh air handling units.
  • DX split AC units.
  • Supply & return air ducts including fittings, accessories & air terminals.
  • Ventilation fans.
Electrical Works including:

  • Main sub board & distribution boards
  • Main & sub main cables including cable containment.
  • Lighting installation including lighting points & light switches
  • Installation of light fixtures.
  • Small power installation including wiring accessories & power isolator.
  • Standalone fire alarm devices.
  • Block wiring for telecom system.


Foxhills Residential D31 Bldg.

  • location :Lusail
  • Client/Owner:Al Jaber Group
  • Contractor:Jefferson International Co.
  • Consultant :Eng. Adnan Saffarini Office
  • Start Date :December 2019
  • Completion date :On going

Scope of Work

Supply, Installation, Testing & Commissioning of the following MEP works:

Electrical Works including:

  • Generator including ATS.
  • Electrical LV distribution including LV-panel, sub main boards & motor control panel.
  • Lighting installation including lighting points & light switches points.
  • Installation only of lights fixtures.
  • Small power installation including power isolator & power points
  • Installation of wiring accessories.
  • Installation of kWh meter.
Plumbing & Drainage Works including:

  • Water Supply and Drainage works.
  • Plumbing equipments including standalone water heaters, water pumps & water tank.
  • Installation sanitary wares & accessories.
  • Installation of water meter.
  • Gas System.
Air Conditioning & Ventilation Works including :

  • Chilled water piping works including valve fitting, insulation, supports & accessories.
  • Chilled water FCU & FAHU.
  • Heat exchanger unit including chilled water pumps.
  • Dx split wall mounted AC units.
  • Ventilation fans.
  • Air ducts including supports, insulation, fittings, accessories & air outlets.
  • Fire sealant related to MEP services.
Fire Fighting System Works including:

  • Fire pump set & connection to concrete water tank.
  • Sprinkler & fire hose reel system.
  • Fire extinguishers & fire blanket.
  • Automatic gas suppression system (FM200) if required by authority (QCDD).
Extra Low Voltage Works including:

  • Passive components for Telephone/Data system.
  • Fire Alarm System.


Al Meera Convenience Store Scheme

  • location :Jeryan Jenaihat
  • Client/Owner:Al Meera Consumer Company
  • Contractor:Derwind Trading & Contracting
  • Consultant :Ace Consulting Engineers (Moharram Bakhoum)
  • Start Date :January 2020
  • Completion date :On going

Scope of Work

Supply, Installation, Testing & Commissioning of the following MEP works:

Electrical Works including:

  • LV-Panel
  • Generator, LV Panel, Main sub board, distribution boards & sub main cables.
  • Lighting installation including lighting points, light switches & light fixtures.
  • Small power installation including wiring accessories & power isolator.
  • Cable containment including cable tray, cable trunk & PVC cable ducts.
  • Lighting Control System
Plumbing & Drainage Works including:

  • Water Supply and Drainage works
  • Plumbing equipments including standalone water heaters, water pumps & water tank.
  • Sanitary wares & accessories.
Extra Low Voltage Works including:

  • Block wiring for Telecom System.
  • Block wiring for MATV System.
  • Fire Alarm System
  • Public Address System
  • IP CCTV system
  • Lightning Protection and Earthing System
Air Conditioning & Ventilation Works including :

  • Chilled Water System
  • Air ducts including supports, insulation, fittings, accessories & air outlets.
  • Smoke fans, pressurization fans, exhaust fans & air curtains
  • FAHU, FCU’s and DX Split Unit
  • Water Treatment & Chemical Cleaning System
  • Building Management System – (provisional sum)
Fire Fighting System Works including:

  • Fire pump set & connection to concrete water tank.
  • Sprinkler & fire hose reel system.
  • Fire Fighting Appliances.
  • Automatic gas suppression system.


Qatar Emiri Signal Corps New Army Camp

  • location :Al Sailiyah
  • Client/Owner:Qatar Armed Forces
  • Contractor:Bahadir Construction Engineering Contracting & Trading Inc.
  • Consultant :Eng. Adnan Saffirrini
  • Start Date :December 2018
  • Completion date :On going

Scope of Work

Supply, Installation, Testing & Commissioning of the following MEP works:

Electrical Works including:

  • LV-Panel, Submain board, distribution boards & sub main cables.
  • Lighting installation including lighting points, light switches & light fixtures.
  • Small power installation including wiring accessories & power isolator
  • Earthing & lightning protection system
Plumbing & Drainage Works including:

  • Water Supply and Drainage works
  • Plumbing equipments including standalone water heaters, water pumps & water tank.
  • Sanitary wares & accessories
Extra Low Voltage Works including:

  • Public Address System
  • Telecom & Data System
  • MATV System
  • Fire Alarm System
  • Central clocking system
Fire Fighting System Works including:

  • Portable fire extinguishers
  • Hose reel & sprinkler system
Air Conditioning & Ventilation Works including :

  • Chilled Water System
  • Supply & return air ducts including supports, fittings, accessories & air outlets. Exhaust fans


MV & LV Substation Works

  • location :Dukhan
  • Client/Owner:Ashgal
  • Contractor:Saudi Binladin Group
  • Consultant :Parsons
  • Start Date :March 2018
  • Completion date :On going

Scope of Work

Supply, Installation, Testing & Commissioning of Electrical works including:

  • Installation of transformer, free standing feeder pillar, LV switchgears, distribution panels, emergency distribution panels & lighting panels.
  • Installation, testing & commissioning of light fixtures including cabling works, light switches & final termination to distribution boards.
  • Small power works including wiring accessories
  • Earth rods – copper bonded for earthing & lightning.
  • Installation of UPS panels
  • LV cable works including cable ladders & termination to substation panel.
  • Installation & testing of 11KV switchgear
  • Installation of battery charger
  • Supply & installation of marshalling box
  • Supply & installation of substation earthing – solid copper
  • Supply & installation of 3Cx70mm2 from SS to TX room
  • Supply & installation of cable termination for 11KV switchgear to the transformer
  • Supply & installation of LV 1Cx630mm2 LSF cables
  • Co-ordinate with Kahramaa for getting self-work approval, approval of materials, arrange fitting inspection, test report submission to KM and energizing.


Warehouse, G+2 Labor Accommodation, G+1 Office & Showroom for Dutest Qatar

  • location :Jery Al Samur Logistics Park
  • Client/Owner:Dutest Qatar W.L.L
  • Contractor:Al Jazeera Trading & Contracting
  • Consultant :>Universal Design Center
  • Start Date :March 2018
  • Completion date :On going

Scope of Work

Supply, Delivery, Installation, Testing & Commissioning and handover to Client of the following MEP works in accordance

with the provided drawings and specifications and approved shop

  • Electrical works including transformer, LV panel, sub main boards, distribution boards, light fixtures, FA system, CCTV system, block wiring for telecom system and wiring accessories.
  • Mechanical works including water supply network, drainage piping network, sanitary wares, water supply pumps, standalone water heaters,rotomould water tanks, fire pump, fire hose reel, sprinkler system, AC units and air outlets.
  • Coordination works with authorities to complete and handover connections works for all MEP services.
  • All external cables to be direct buried no electrical manholes. Only duct banks consider for road crossing.
  • All external cables to be direct buried no electrical manholes. Only duct banks consider for road crossing.
  • Adjustment of quantities in the BOQ as per the provided IFT drawings.
  • White plastic finish for wiring accessories.
  • 1000 kV A transformer
  • White plastic finish for wiring accessories.
  • Wall mounted split AC for offices & 4nos. floor mounted split AC for showroom.
  • Omission of VRF AC power supply & replace with split AC unit power supply.
  • Standalone emergency & exit lights