FIT OUT WORKS FOR PODIUM (3B+G+P+CAR PARK BUILDING)
location :West Bay
Client/Owner:Qatar Petroleum
Contractor:Medgulf Construction Co W.L.L.
Consultant :AEB
Start Date :October 2020
Completion date :On going
Scope of Work
Supply, Installation, Testing, Pre-Commissioning & Commissioning Works of Mechanical, Electrical and ELV Works Category 1 for QCDD related works at Tower 10
Installation of Fire Alarm system MIMIC Panels
Installation of FHC’s
Installation of Fire Alarm break glass
Installation of Heat detectors in Elevator Machine Room
Smoke Test for extract System
Re-testing & Commissioning of all QCDD Base Built Systems
Installation of FHC’s
Supply, Installation of Motorized Dampers, etc
Installation of Heat detectors in Elevator Machine Room
ESPRESSO LAB
location :West Bay
Client/Owner:Al Rayyan Tourism Investment Company
Contractor:Derwind Trading & Contracting
Consultant :Sketch Engineering Consultancy
Start Date :July 2018
Completion date :Sept. 2018
Scope of Work
Electrical Works including:
Distribution boards (SMSB & DB) including submain cables & cable containments
Lighting installation including lighting points, light switches & installation only of light fixtures
Small power works including power socket point, power isolator & wiring accessories Ozone Generator & Interlock
Extra Low Voltage Works including:
Addressable fire alarm system including detectors, emergency lights & exit lights as per minimum requirement of QCDD.
3 points for telephone/data only
Background Music System
Mechanical Works:
PPR pipes & fittings for exposed piping at roof, embedded to wall piping & suspended to ceiling water supply piping works.
UPVC pipes & fittings for drainage piping works
Plumbing equipments including standalone water heaters
Fire Extinguishers
Sprinkler System
Exhausts fans
Air ducts including duct accessories & air outlets