Maintenance Projects

Imam Muhammad Bin Abdul Wahhab Mosque No. MS1111

  • location :Lukhair Area
  • Client/Owner:Ministry of AWQAF
  • Contractor:Cayan
  • Start Date :October 2020
  • Completion date :On going

Scope of Work

  • Maintenance of Electrical
  • Maintenance of Audio
  • Maintenance of Escalator
  • Maintenance of Elevator


UNICHEM OFFICE BLDG., WAREHOUSE & FACTORY FIRE SAFETY MAINTENANCE

  • location :New Industrial Area
  • Client/Owner:Unichem Limited
  • Start Date :August 2019
  • Completion date :On going

Scope of Work

  • To conduct maintenance and inspection in accordance with QCDD and NFPA standards, along with the manufacturer’s recommendation.
  • Quarterly functional test of Fire Pump set thru Manual and Automatic Operation of the System by discharging water from the test and drain line of Fire Hose Reel System or thru the bypass test line.
  • Quarterly check-up of the Fire Pump working performance in accordance with QCDD and NFPA standards, along with the manufacturer’s recommendation.
  • Quarterly check-up of Pump controller, manual and automatic operation.
  • Observe and check and functional test of all mechanism being monitored by the Building Fire
    Alarm System.
  • Restore all system into normal operation and condition.
  • Conducting visual and preliminary inspection for all field initiating devices (smoke / heat detectors /manual call points/Interface units) and auxiliary field devices (alarm bell / horn strobes) including fire alarm control panel.
  • Clean all devices and all modules inside Fire Alarm Control Panels in each loop by using blower machine, dry cloth and spray contact cleaner to all terminal connectors to maintain contact terminals free from any moistures and free from any dust respectively.
  • Conduct functional test of the system by simulating some devices randomly using smoke tester, heat gun and pushing MCP or pulling MPS and be sure that all interfaces are working properly.
  • Conduct visual and final inspection of the system and make records of the status of the Field Initiating and Auxiliary Devices as well as the System.
  • Check that all the external component parts and spare parts of fire extinguisher are all in good shape and not corroded, cracked hose of broken nozzle/horn, etc., and make records.
  • Check cylinder bracket/hawks are installed properly and physically good. Rectify or fix brackets as required, and make records. (Supply of wall mounted brackets/hawks shall be charged accordingly.
  • To conduct maintenance and inspection in accordance with the related NFPA guidelines.
  • Complete visual check-up of all related and component parts of Fire Hose Cabinets like Hose Valves, Fire Hose, Fire Nozzles, etc. once in every quarter of the year.
  • Access control system
  • To conduct random flow, test every quarter of the year by actual discharge of water by using the Fire Hose and observe the pressure of the system.


BIN ARBAID OFFICE BUILDING FIRE SAFETY MAINTENANCE

  • location :Al Khor
  • Client/Owner:Bin Arbaid Trading & Contracting
  • Start Date :June 2019
  • Completion date :On going

Scope of Work

  • Maintenance of Fire Alarm System
  • Maintenance of Fire Fighting System
  • Maintenance of Fire Hose Reel
  • Maintenance of Emergency Lighting System


KULUD PHARMACY AND MY PHARMACY FIRE SAFETY MAINTENANCE FOR

  • location :15 Different Branches in Doha
  • Client/Owner:International Medical Company
  • Start Date :January 2019
  • Completion date :On going

Scope of Work

  • Service and Maintenance of Fire Alarm System and Fire Extinguishers
  • Conducting full inspection of all the existing systems as quoted and as per the provisions in the NFPA codes and as per recommendations of the Manufacturer.
  • Conducting visual and preliminary inspection for all field initiating devices (smoke / heat detectors / manual call points/Interface units) and auxiliary field devices (alarm bell / horn strobes) including fire alarm control panel.
  • Clean all devices and all modules inside Fire Alarm Control Panels in each loop by using blower machine, dry cloth and spray contact cleaner to all terminal connectors to maintain contact terminals free from any moistures and free from any dust respectively.
  • Supply and install of additional fire alarm & firefighting equipment to comply with CDD
  • Conduct visual and final inspection of the system and make records of the status of the Field Initiating and Auxiliary Devices as well as the System.
  • Prepare the maintenance field service report and let it be signed and approved by the authorized representative.
  • Checking of external component parts and spare parts of fire extinguisher are all in good shape and not corroded, cracked hose of broken nozzle/horn, etc., and make records.
  • Checking of cylinder bracket/hawks are installed properly and physically good. Rectify or fix brackets as required, and make records.
  • Testing & Commissioning


FIRE SAFETY MAINTENANCE FOR AL JAZEERA EXCHANGE CO.

  • location :7 Different Branches in Doha
  • Client/Owner:Al Jazeera Exchange Co.
  • Start Date :July 2018
  • Completion date :On going

Scope of Work

  • Replacement of defective fire alarm system equipment including FACP loop cards and LCD Display, Fire Bells, Smoke Detectors, Heat Detectors, Emergency & Exit Lights.
  • Repair of Jockey Fire Pump
  • Replacement of defective fire fighting equipment including 4 ”&2” check valves & upright sprinklers.
  • Supply and install of additional fire alarm & firefighting equipment to comply with CDD
  • Testing & Commissioning


GREAT WALL CHINESE RESTAURANT FIRE SAFETY MAINTENANCE

  • location :Salwa Road
  • Client/Owner:Great Wall Chinese Restaurant
  • Start Date :April 2013
  • Completion date :On going

Scope of Work

  • Supply & install of fire alarm system including Single Zone Conventional FACP, Manual Call Point, Fire Bells, Photoelectric Smoke Detectors, Heat Detectors, Emergency & Exit Lights & Interface Module Unit with Gas Shut-Off.
  • Repair of Jockey Fire Pump
  • 1 year Fire Safety System Maintenance
  •  Supply & install of firefighting equipments including 9kg & 4.5kg Dry Powder Fire Extinguishers, & Fire Blanket
  • Testing & Commissioning